Electrified Double Track Project Between Rawang and Ipoh (Bridge Works) (Bridge Works : RB774, 736, 731, 810 and 734, Total Deck Area=3,915m2)

Electrified Double Track Project Between Rawang and Ipoh (Bridge Works) (Bridge Works : RB774, 736, 731, 810 and 734, Total Deck Area=3,915m2)
Location:
Perak
Client:
Loh & Loh Construction Sdn. Bhd.
Status:
Completed - July 2001 to March 2006